Design and construction progress of BRIF

Get Citation
ZHANG Tian-Jue, GUAN Xia-Ling and CUI Bao-Qun. Design and construction progress of BRIF[J]. Chinese Physics C, 2010, 34(1): 103-111. doi: 10.1088/1674-1137/34/1/019
ZHANG Tian-Jue, GUAN Xia-Ling and CUI Bao-Qun. Design and construction progress of BRIF[J]. Chinese Physics C, 2010, 34(1): 103-111.  doi: 10.1088/1674-1137/34/1/019 shu
Milestone
Received: 2009-02-06
Revised: 2009-03-29
Article Metric

Article Views(3097)
PDF Downloads(623)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Design and construction progress of BRIF

    Corresponding author: ZHANG Tian-Jue,

Abstract: 

A new RIB project, the Beijing Radioactive Ion-beam Facility (BRIF), has been running at CIAE since 2004. In this project, a 100 MeV H-cyclotron, CYCIAE-100, is selected as the driving accelerator providing a 75-100 MeV, 200-500 μA proton beam. An ISOL system employs two stage separators to reach the mass resolution of 20000. Its RIB beam will be injected into the existing Tandem and a superconducting booster installed down stream of the Tandem will increase the energy by 2 MeV/q. The progress of BRIF, giving special emphasis to CYCIAE-100, will be introduced in this paper.