Design and construction progress of BRIF
- Received Date: 2009-02-06
- Accepted Date: 2009-03-29
- Available Online: 2010-01-05
Abstract:
A new RIB project, the Beijing Radioactive Ion-beam Facility (BRIF), has been running at CIAE since 2004. In this project, a 100 MeV H-cyclotron, CYCIAE-100, is selected as the driving accelerator providing a 75-100 MeV, 200-500 μA proton beam. An ISOL system employs two stage separators to reach the mass resolution of 20000. Its RIB beam will be injected into the existing Tandem and a superconducting booster installed down stream of the Tandem will increase the energy by 2 MeV/q. The progress of BRIF, giving special emphasis to CYCIAE-100, will be introduced in this paper.