DESIGN AND BEAM TEST FOR THE BPL 35.5MeV BEAM TRANSPORT SYSTEM
- Received Date: 1900-01-01
- Accepted Date: 1900-01-01
- Available Online: 1987-08-05
Abstract: The physical design and beam test for the BPL 35.5MeV beam transport system are described. This system was constructed and put into operation into operation in December 1986. After preliminary adjustment, the beam transfer efficiency of the two beam lines of this system reached 88% and 93% respectively.