- 
                        
                                 Abstract:The upgrading of HI-13 tandem accelerator radioactivity protection interlock system will extend and optimize the original protection logical as well as the involved PLC control technology. A new reasonable displayed interface and convenient operation system will be designed.
- 
	                          
- 
                        References
	
			| [1] | . Operation Ragulations For HI-13 Tandem Accelerator(in Chinese)(HI-13中列加速器运行操作规程)2. LI Zong-Qiang, FU Ming-Deng et al. Nuclear ElectronicDetection, 2004, 24(3)(in Chinese)(李宗强, 伏明灯等. 核电子学与探测技术, 2004, 24(3)) 
 |  
 
- 
                    	
	
				| [1] | HUANG Wen-Xue
								, WANG Yue
								, ZHU Zhi-Chao
								, TIAN Yu-Lin
								, XU Hu-Shan
								, SUN Zhi-Yu
								, XIAO Guo-Qing
								, ZHAN Wen-Long
								. Experimental Study of the High-Voltage Breakdown and Simulations for the RFQ Cooler and Buncher RFQ1L. Chinese Physics C,
							2006, 30(S2): 261-264. |  
				| [2] | PENG Quan-Ling
								, SUN Jian
								, ZHAO Guang-Yuan
								, SHI Cai-Tu
								. Principle and Software Design of Helmhotz Coil Measurement System. Chinese Physics C,
							2001, 25(9): 920-925. |  
				| [3] | Xu Jianming
								. Matching Problem of Lattice with Transverse Coupling. Chinese Physics C,
							1995, 19(1): 73-81. |  
				| [4] | WANG Man
								, LI Jin
								, CUI Xiang-Zong
								, XIA Xiao-Mi
								, LAI Yuan-Fen
								, YAO Xiao-Guang
								. PROTOTYPE OF END CAP SHOWER COUNTERAND ITS BEAM TEST. Chinese Physics C,
							1987, 11(3): 321-326. |  
 
- 
                        Access  
- 
                        
-